Projects

Projects that have been installed, completed and commissioned on site

Development of a phenol extraction unit

Aims at :

Development of a phenol extraction unit and the application of modern technology using N M P solvent


Separation of the fire fighting network from the cooling water network

Aims at : 

Raising the pressure of the firefighting network to achieve international standards and raise the degree of protection of equipment and devices that work with petroleum materials


Create a 12 . diameter line

Aims at :

To feed marketing companies with 80 gasoline


Establishment of (2) reciprocating compressors for the ammonia unit in the unit (16)

Aims at: 

Maintaining the operating conditions of the unit and raising the cooling efficiency of the ammonia circuit


Establishment of a new turbine line with a diameter of 12 inches and a length of 2 km

Aims at:

To increase the payment rates of the kerosene product from Al-Amriya Company to the Elab Company


HF Establishment of an early warning system for the smuggling of acetic acid

Aims at:

Early detection and suppression of gas leakage to protect equipment and personnel, unit monitoring and remote gas shutdown control


Replacement and renewal of the line 36 inches by unit 16

Aims at:

Early detection and suppression of gas leakage to protect equipment and personnel, unit monitoring and remote gas shutdown control


Cold Box for feeding 2200 m3/h of dry air

Aims at:
Providing the necessary nitrogen to meet the needs of the production units with the appropriate pressure to secure the operating conditions


Modernization of the digital control system alkylbenzene complex

Aims at :

Securing the operational process maintaining the efficiency of the operation of the various production units

Modernization of the digital control system for aromatics complex

Aims at:

securing the operational process – maintaining the efficiency of the operation of the various production units


Unit Propane Compressor (13A)

Aims at:

Maintaining unit operating conditions and increasing pressure from 800: 1400 m3/h


Central Flame Update

Aims at :

Providing the necessary nitrogen to meet the needs of the production units with the appropriate pressure to secure the operating conditions


Ongoing projects


Two reciprocating air compressors for nitrogen production unit

Aims at :

To provide nitrogen in an appropriate quantity and pressure to meet the demands of production units and future uses as well as unit expansions 14


Create, replace and renew both
14, 15 diesel tanks
42 tanks, 43 petrol

Aims at : 

Replacement and renewal of existing tanks and towers and increasing the company’s storage capacity


Supply and installation of an automatic warning and extinguishing system for the crude tanker (1, 2, 3, 4, 5, 6)

Aims at :

Achieving safety and industrial security conditions for equipment, personnel, insurance, and protecting tanks from fire


Supply and installation of an automatic alarm and extinguishing system for gasoline tanks (first stage)

Aims at: 

Achieving safety and industrial security conditions for equipment, personnel, insurance, and protecting tanks from fire


Complete modernization of the alarm and extinguishing system of the main power station and main transformers

Aims at:

Achieving the conditions of industrial safety and security for equipment and personnel and securing the operational process


Continuous monitoring system for pollutants on the discharge of industrial wastewater and cooling water on Lake Mariout

Aims at:

Early warning of pollutants on the industrial wastewater drainage from the company’s units to avoid leakage problems


Supply and installation of an automatic alarm system for the building (administration – laboratory – safety)

Aims at:

Early warning in the event of fires in the aforementioned buildings


A complete update of the network of fire alarm systems

Aims at:

Achieving the conditions of industrial safety and security for equipment and personnel and securing the operational process


Automatic alarm system and manual extinguishing of vessels and compressors of the company (first stage)

Aims at :

Securing vessels and compressors from the risks of leaks and fires


Automatic foam alarm and extinguishing system for biological treatment and oil separation basins

Aims at:

Achieving the conditions of industrial safety and security for equipment and personnel and securing the operational process


Automatic fire extinguishing system and alarm for stores of make-up and chemicals with foam

Aims at:

Insurance and preservation of the company’s property from fires and recommendations of the company’s civil defense


Complete the cooling water treatment and recovery system (first stage) ZLD

Aims at :

Implementation of the cooling water treatment and recovery system by converting the cooling water into a closed circuit to be retrieved and benefited from


LOCATION

Marghem K 17 Alex-Cairo Desert Road